Lead time is the time between deciding to order stock and having it on the shelf, ready to sell or use.
The four parts of lead time
Lead time is often taken to be the supplier's delivery time. In practice it has four parts:
- Ordering time. Noticing the need and raising the order.
- Approval time. Getting a yes from whoever approves purchases.
- Supplier time. From the order reaching the supplier to the goods arriving.
- Receiving time. Checking the delivery and putting it on the shelf.
Why lead time matters
Lead time decides how early you must order. The longer it is, the more stock you need on hand when you order, and the more a late delivery hurts.
Reorder-by date = today + days of stock left - lead time
If an item has 12 days of stock left and the lead time is 9 days, you have 3 days to place the order.
Lead time and safety stock
Lead time that varies is a bigger problem than lead time that's long. A supplier who always takes 10 days is easy to plan around. One who takes anywhere from 4 to 14 days forces you to hold more safety stock. Recording actual delivery dates against each order shows which suppliers vary most.
Lead time between your own locations
For a store restocked from your warehouse, the lead time is the transfer time: from request to dispatch to receipt. It is usually much shorter than a supplier's, which is why stores can often hold lower minimums than the warehouse.
How to shorten lead time
- Approve routine orders quickly, or let someone closer to the work approve them.
- Order from suppliers who hold stock nearby.
- Receive deliveries on the day they arrive.
- Keep a little extra at a central warehouse so stores can be restocked by transfer.
Recording lead time per supplier
Keep a lead time for each supplier, and where it differs, for each supplier and item. Then check it against reality: compare the date each purchase order was raised with the date it was received.
Lead time in NaviaLabs
Each supplier in NaviaLabs has a lead time in days. It is used to work out reorder-by dates, and reorder suggestions cover the longer of 30 days or three lead times of expected demand. Where no supplier lead time is known, the forecast says the lead time was assumed.
Frequently asked questions
What is a good lead time?
There's no single figure. A short, steady lead time is best, because it lets you hold less stock. Steady matters more than short.
How do I measure lead time?
Record the date each order was raised and the date the stock was ready to sell, and take the average over recent orders. Keep the longest too, for safety stock.
Does lead time include approval?
It should. Any delay before the order reaches the supplier adds to the time you have to cover with stock on hand.
What is the difference between lead time and cycle time?
Lead time is the wait for stock you order. Cycle time is usually used for how long a process takes once started, such as producing a batch in a factory.